Bathroom Remodel Project
1.0. Design Home Bathroom
2.0. Remove old bathroom fixtures
      2.1. Remove ventilation fan
      2.2. Remove sink
      2.3. Remove lights
         2.3.1 Shut off fuse box to the bathroom     
      2.4. Remove tiles
      2.5. Remove tub
      2.6. Remove toilet
      2.7. Remove flooring
      2.8. Remove backer board
      2.9. Remove tub/shower faucet
         2.9.1 Shut off water supply
3.0. Construct the bathroom 
      3.1. Purchase new bathroom fixtures
      3.2. Install new bathroom fixtures
         3.2.1. Install new brass pipe fixture for tub/shower faucet
         3.2.2. Replace backer board 
            3.2.2.1. Tape backer board to sides of existing drywall
         3.2.3. Install new tub assembly
            3.2.3.1. Line edges of tub with caulking sealant compound
         3.2.4. Set tiles along the shower wall using tile mixture
         3.2.5. Install shower curtain rod
         3.2.6. Install faucet fixtures for shower/tub
         3.2.7. Set tile flooring
         3.2.8. Install new sink
         3.2.9. Install new vanity light fixture
         3.2.10. Install toilet
            3.2.10.1. Set new wax floor gasket
      3.3. Paint bathroom
 